Gikondo Substation
The work at Gikondo Substation consisted to Rehabilitation by replacing Outdoor 110kV Switchgears such as Disconnectors, Current and Voltage transformers, Circuit Breakers, Lightning Arrestors, and Bus Bars including all equipment foundations civil works.
This project had a challenge of working into a Substation which is under operation meaning to isolate one partof the substation while another part is still operating/Energized to avoid the permanent power shutdown as the Substation conditions were requiring to remain into operation as one of the main Substations of the Kigali City.
Location: Kigali, Gikondo
Services: Connection of Disconnectors to the Bus Bars
Period:From October 2012 up to March 2014
As a provider of innovative, quality engineering and consulting services.
PITRAD IBAMBA Ltd possesses a solid competence in all the field of power transmission and distribution ranging from design, social and environmental impact mitigation, valuation and expropriation procedures, construction, engineering and commissioning for both transmission lines and Substation up to110 kV.